Create a free Equipment World account to continue reading

$646 million St. Croix Crossing project officially opens

Updated Aug 4, 2017

Scrc 2017 07 26 T Crop

The $646 million St. Croix Crossing project officially opened during a ribbon cutting ceremony yesterday featuring Minnesota Gov. Mark Dayton and Wisconsin Gov. Scott Walker. It has been under construction since 2012.

The project, which spans the St. Croix River connecting Oak Park Heights, Minnesota, and St. Joseph, Wisconsin, is a 5,000-foot extradosed bridge that features four lanes of traffic in each direction.

“This new bridge reinforces the strong economic ties between Minnesota and Wisconsin, better connecting people with jobs, families, and better opportunities on both sides of the river,” says Dayton. “I thank the strong bipartisan leadership from both states that has made this project a success, supporting jobs for more than 3,000 people from Minnesota and Wisconsin over its four-year construction.”

Looking West From Pier 9b Crop

“This outstanding bridge I call ‘Cooperation’ is the product of a lot of hard work and dedication by those who built it, and it is the product of hard work and bipartisan cooperation between officials in our two states,” says Walker. “The St. Croix Crossing greatly eases traffic congestion and provides an uninterrupted flow of commerce for the benefit of the people, and I thank Governor Dayton and his team, our team at the Wisconsin Department of Transportation, and those at every level of government who worked on this project for sharing our commitment to getting this decades-long project done.”

The bridge is a replacement for the Stillwater Lift Bridge that is about one mile upstream. The old bridge, Minnesota Department of Transportation (MnDOT) reports, was dedicated more than 80 years ago. It caused congestion issues periodically, as it had to lift to allow for boat traffic on the river.