Material price changes from May 2009 to June 2009

Percent change from May to June 2009/ June 2008 to June 2009


Gasoline — +18.0 / -37.8

No. 2 Diesel fuel– +14.6 / -54.6

Crude petroleum– +20.3 / -48.6

Synthetic rubber– +2.9 / -7.2

Plastic construction products– -0.1 / +0.8

Softwood Lumber– +1.7 / -18.1

Hardwood Lumber– -0.6 / -9.8

Plywood– -0.3 / -11.2

Steel mill products– -0.7 / -38.5

Aluminum mill shapes– +0.2 / -23.7

Copper and brass mill shapes– +6.0 / -17.5

Fabricated structural metal products– -0.7 / -4.2

Nonferrous pipe, tube and fittings– not available / not available

Cement– -1.1 / +0.5

Concrete products– +0.1 / +1.9

Asphalt felts and coatings– +4.8 / +31.2

Gypsum products– -0.7 / +2.8

Iron ore– 0.0 / +5.4

Iron and steel scrap– +1.6 / -62.0

Copper base scrap– +5.7 / -32.4

Construction sand, gravel, and crushed stone– -0.4 / +5.0

Construction machinery and equipment– +0.3 / +3.9